Search
Close this search box.

Norfest – Fiber Optic Cable Installation

Client: Tampnet
When: 2023
Location: Norway

Vessel: Edda Fjord

Field: n/a

Turnkey contract for:

  • Procurement of 750km of cable including 7 branching units and 2 PLSEs
  • Survey of cable route
  • Engineering
  • Permit applications and notifications
  • Installation and simultaneous burial of cable
  • 135 crossings
  • 10 landfalls, 8 joints
  • Inshore trenching
  • Logistics & transport

 

Keywords: turnkey, installation, logistics, cable crossings, fibre optic cable, simultaneous burial, testing, permits