Search
Close this search box.

Ashtart Export Solution

Client: Sarost SA / Serept
When: 2015
Location: Tunisia

Lump Sum contract for:

  • Replaced 6x 130 m anchor chains
  • Chain inspection
  • Hook-up of intermediate FSO
  • Disconnection of electrical cable
  • Disconnection of 20” and 10” risers
  • Disconnection of the Ifrikia II FSO
  • Project management and engineering