Search
Close this search box.

Okoro Flexibles

Client: Deepflex / Afren
When: 2007–2008
Location: Nigeria
  • Offshore installation of 4” gas lift production flowline from FPSO to WHP, length 800 m
  • Offshore installation of 6” test production flowline from FPSO to WHP, length 800 m
  • Offshore installation of 8” main production flowline from FPSO to WHP, length 800 m
  • Project management and engineering