Lump sum contract for: Installation and simultaneous burial of a 200 km fibre optic cable between the UK and Netherlands. Engineering, Logistics and Transport, PLGR and Route Clearance, Cable Crossings and Jointing and testing.
Lump sum contract for:
Installation and simultaneous burial of a 170 km fibre optic cable between the Norway and Denmark/Engineering/Logistics and Transport/Beach pull at both ends/Testing
Lump sum contract for: Installation and simultaneous burial of a 200 km fibre optic cable between the UK and Netherlands/Engineering/Logistics and Transport/Cable Crossings/Jointing and testing.
Lump sum contract for:
Installation and simultaneous burial of a 170 km fibre-optic cable between Denmark and Norway/Engineering/Logistics & transport/Inshore & diving operations
Lump sum contract for:
Upending, installation and piling of platform jacket/Installation & welding of topsides to jacket/Installation of flexible flowline riser/Installation of CALM buoy & all related anchors & mooring legs/All related engineering and transport of structures & equipment.
Lump- and provisional sum contract for the removal and decommissioning of deepwater subsea equipment: 9 x flexible risers/1 x dynamic umbilical/All buoyancy elements/FPSO mooring lines/Submerged STP buoy/All related engineering & logistics.
Lump sum contract for: Contracting of multiple vessel installation spread/Pre-tensioning works 16x mooring lines/Installation of FPSO/Engineering/Logistics & transport.
Installation of 3 x 4” gas risers to FPSO/Installation 3 x3km gas lift pipelines/Flowline stabilisation with concrete mattresses/Project management and engineering.
Procurement & transport of 45 km rigid linepipe (API 5L X52)/Onshore fabrication of triple joints/Offshore installation of 34 km of 6” pipeline/Offshore installation of 11 km of 4.5” pipeline/Project management and engineering.
Offshore installation of 2x utility umbilicals between Morsa West & satellites, total 10 km/Offshore installation of 5x power cables between Morsa West & satellites, total 25 km/Project management and engineering.
Procurement & transport of 26 km rigid linepipe (API 5L X65)/Onshore fabrication of triple joints/Offshore installation of 20 km of 6” pipeline/Offshore installation of 6 km of 4.5” pipeline/Project management and engineering.
Offshore installation of 4” gas lift production flowline from FPSO to WHP, length 800 m/Offshore installation of 6” test production flowline from FPSO to WHP, length 800 m/Offshore installation of 8” main production flowline from FPSO to WHP, length 800 m/Project management and engineering.
Installation and recovery of 8” temporary loading system hose from semi-submersible to tanker Navion Britannia, length 550 m/Installation and removal of similar 8” temporary loading system hose/Water depth 370 m/Fast track project, about 2 months from call-off to completion/Project management & Engineering.
Procurement & transport of 8 km rigid linepipe (API 5L X65)/Onshore fabrication of triple joints/Procurement of pig launchers, pig receivers and all temporary installation aids/Offshore installation of 8 km of 10” rigid pipeline/Project management and engineering.
Installation and recovery of 8” temporary loading system hose from semi-submersible to tanker Navion Britannia, length 550 m/Installation and removal of similar 8” temporary loading system hose/Water depth 370 m/Project management & Engineering.
Lump sum contract for:
Offshore installation of 4x 6” production risers/flowlines from FPSO to wellheads/Offshore installation of 4x control umbilicals/risers from FPSO to wellheads/Water depth 140 m/Project management and engineering.
Recovery of 2x 6” flexible flowlines and re-lay in new corridors/Recovery of 2 umbilicals and re-lay in new corridors/Procurement of required temporary items/Project management and engineering.
Lump Sum contract for: Replaced 6x 130 m anchor chains/Chain inspection/Hook-up of intermediate FSO/Disconnection of electrical cable/Disconnection of 20” and 10” risers/Disconnection of the Ifrikia II FSO/Project management and engineering.
Installation & connection of multiple 24 kV and 52 kV subsea electrical cable to a subsea marine substation and subsea connection box/Installation of subsea fibre cable/Installation of subsea generator cable/Project management & Engineering.
Heavy lift transport of an offshore construction vessel/Contracting of Heavy Lift Vessel/Seafastening calculations/Stability assessment/Project management, engineering and on-site supervision.